
A quality system built for automotive audits
IATF 16949:2016 certified since October 2025, with inspection at the press, before painting and before dispatch. PPAP and APQP documentation on every programme.

IATF 16949:2016, and how to verify it
Three inspection gates
A part is checked where it is made, before it is painted and before it leaves. Each gate has its own lab on site.
At the press
First-off and in-process checks in the moulding quality lab, on dimensions, material and surface.
Before painting
The substrate is checked before the first coat, so a moulding issue is caught before it becomes a paint defect.
Before dispatch
Film thickness, adhesion and hardness checks in the paint shop quality lab before the part is packed.
Two labs, next to the line
The equipment we use to approve parts, listed so your SQE knows what to expect at audit.
Moulding quality lab
Dimensional, material and environment checks.
- LUTHRA surface plate1000 × 1000 mm
- BAKER DH600 digital height gauge0–600 mm
- Digital verniers0–150 / 300 / 600 mm
- MITUTOYO digital micrometer0–25 mm
- Pin gauge set1–12 mm, 0.01 mm steps
- TESTRONIX MFI testerMelt flow index
- TESTO 905-T2 surface thermometerSurface temperature
- Lux meterInspection lighting
Paint shop quality lab
Film, adhesion, hardness and paint checks.
- DFT meterPosiTector
- Wet film thickness testerFilm build
- Cross-cut adhesion testerAdhesion
- Pencil hardness testerHardness
- Viscosity testFord cup
- Hegman gaugeFineness of grind
- Temperature-humidity meterAmbient conditions
- Weighing balance and magnifier

Training Gurukul: every new joiner trains before they touch production
Structured in-house training on the moulding process and defect prevention, so the people running your part know what can go wrong and how to stop it.
Quality policy
Our commitment is to exceed customer expectations by embedding quality into every process and consistently delivering on Quality, Cost and Delivery.
A new plant designed to environmental norms
Our paint shop was built with its own sludge handling and fire protection, and we are implementing environmental and occupational health and safety management systems across the site.

